gds

High temperature heat insulation air hose

Short Description:

Rigid Hose

The telescopic airport air conditioning hose is a helical structure (with wear strips) supported by wire.

Flexible hose which is available insulated or non-insulated. A substantial range of Helical wire pitches, exterior fabrics and insulation levels are available.


Product Detail

Product Tags

nuowei_01
High-temperature-heat-insulation-air-duct-(2)

PCA Spiral Hoses

Rigid Hose

The telescopic airport air conditioning hose is a helical structure (with wear strips) supported by wire.

Flexible hose which is available insulated or non-insulated. A substantial range of Helical wire pitches, exterior fabrics and insulation levels are available.

Hose construction begins with three basic components:

An 21 oz. PVC coated fabric outer jacket. a helical structure (with wear strips) supported by wire.

2″ thick poly fiber insulation blanket

inner layer is18oz. PVC coated fabric

Insulation is wrapped in the middle layer, Quality sewn construction with your choice of inlet/outlet sizes and standard or custom hose lengths.  All velcro or zipper cuffs are standard.

We also produce air-conditioning flexible hoses with hot melt process, which eliminates pinholes, prevents rainwater from entering, and eliminates the phenomenon of pinhole air leakage.

nuowei_03
nuowei_05
about_pro

Our Services

1.Monday to Sunday 24 hours per day online service.

2.Professional advice on order,packages and delivery

3.Different sizes are available according to buyer’s requirement.

4.Small trial order accepted.

5.Test by United Nation Quality Detection.

6.Good quality and competitive price.

7.100% strict quality inspection before despatch

nuowei_08
nuowei_09

FAQ

Q: What's your production lead time?
A: The delivery time is determined by the quantity of your order and the quantity of our stock.

Q: Do you accept custom design products?
A: Yes, of course. Custom size, color, design are available. We have 10 years working and production experiences staff who can help make the perfect and qualified products for you.

Q: Payment Terms:
A: 30% deposit, 70% after the goods are ready.

Q: Are you a factory or trading company?
A: We are a factory with four workshops.

Q: what is goods lead time?
A: According to clients’ requirements,generally the lead time is 5 to 15 days.


  • Previous:
  • Next: