gds

air condition ventilation hose reducer

Short Description:

Reducers & Adapters

Components for Air Conditioning Insulation Hoses (Reducers & Adapters),Various sizes are available on request. Pre Conditioned Air (PCA) flat hoses, rigid wire supported hoses, tapered PCA adapters and elbow assemblies for the airline industry.
Insulated or non-insulated options。

It can be made into Y-type, T-type and other dual-port or three-port multi-channel transfer hoses according to customer requirements
The zipper + abrasive sticker is used at the joint, which is easy and quick to connect
Length can be any combination


Product Detail

Product Tags

nuowei_01
air condition ventilation hose reducer (2)

Reducers & Adapters 

Components for Air Conditioning Insulation Hoses (Reducers & Adapters),Various sizes are available on request. Pre Conditioned Air (PCA) flat hoses, rigid wire supported hoses, tapered PCA adapters and elbow assemblies for the airline industry.
Insulated or non-insulated options。

It can be made into Y-type, T-type and other dual-port or three-port multi-channel transfer hoses according to customer requirements
The zipper + abrasive sticker is used at the joint, which is easy and quick to connect
Length can be any combination

nuowei_03
nuowei_05
about_pro

Our Services & Strength

1. Detailed quotation sheet be provided within in 24 hours after received customer's inquiry
2. Factory self goods inspection report will be provided for each mass production order
3. Professional loading photos for each order
4. All the artwork we can design for you as your requirement.
5.Young and big team service for you.
6.Professional R&D team.
7.One stop purchase serivce.

nuowei_08
nuowei_09

FAQ

Q: What's your production lead time?
A: The delivery time is determined by the quantity of your order and the quantity of our stock.

Q: Do you accept custom design products?
A: Yes, of course. Custom size, color, design are available. We have 10 years working and production experiences staff who can help make the perfect and qualified products for you.

Q: Payment Terms:
A: 30% deposit, 70% after the goods are ready.

Q: Are you a factory or trading company?
A: We are a factory with four workshops.

Q: what is goods lead time?
A: According to clients’ requirements,generally the lead time is 5 to 15 days.


  • Previous:
  • Next: